1 March 2020: Electrics Completed


It’s been a long time coming…the Electrics Module is finally completed and has been installed into Electric Chair #1.  It fits right in.  Nice to be able to work on this entire assembly while it is on the bench…and then to be able to easily install.

There are some tweaks needed to the interface between the Drive Frame and the automata proper…but this was to be expected.  Being under power things are much easier to troubleshoot.  I suspect that within a week or two I will consider the “machine” part of the project to be done and will begin disassembly and paint.

The Corona Virus continues to spread around the world.  China is struggling to get back to work.  Meanwhile, the 3D printer that I’ve been interested in has increased in price by about $60 (on Amazon).  Chinese produced.  Oh well.

The Democratic Party continues to be fragmented. They are in the stage right now where they beat each other up.  So sad…the process. 

This is the completed Electrics module